01
The margin cut, grazed or wetted in the week before its date, rather than everywhere on a cycle.
02
Vegetation and fire contractors, tenders and site crews staged on the day the wind turns.
03
The utility's segment through dated fuel inspected or switched on the operator's timetable for backup generation.
04
Cover placed and covenants met on a forecast and a documented standard of care.
Site contracts
Every hectare's days to 90%, the path under forecast wind, the site's own assets in the path with a modelled loss to each, and alerts at 14 and 7 days into the control room and to the contractors you name. Refreshed daily as the fuel dries.
A portfolio of substations, solar farms or compressor stations is covered the same way: every site on the hectare grid, ranked by date, so the vegetation budget goes to the sites that carry dates.
Add-on
The fuel outside the fence belongs to a neighbour, the verge to the county, the feeder to the utility. On the Intervention Plan a named agent secures the treatment, the verge cut and the feeder inspection on the site's date, and hands you a ledger your insurer and lender can read.
How the plan works →